Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Upper)"
Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Upper)"
Line 7: | Line 7: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:7.1.5. | + | |
+ | {| class="wikitable"; table style="background-color:white"; border="#A9A9A9;" | ||
+ | |+ Click on any image to expand it | ||
+ | |- | ||
+ | | [[File:ASh 10.7.1-1 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/e/ef/ASh_10.5.1-1_CD.jpg]] | ||
+ | |- | ||
+ | | [[File:ASh 10.7.1-2 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/e/ed/ASh_10.5.1-3_CD.jpg]] | ||
+ | |} | ||
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
+ | === WORK INCLUDED === | ||
+ | ;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements. | ||
+ | ;(2)[[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShEAVES|'''Eave Protection Membrane''']]: Applied beneath the metal valley flashing. | ||
+ | ;(3)[[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]: | ||
+ | ;(4) Metal Counterflashing. | ||
+ | ;(5) Metal Edge Flashing (refer to the related Membrane Standards, '''10.3.5.2 Metal Edge Terminations'''). | ||
+ | ;(6) Field Membrane (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS'''). | ||
+ | |||
+ | <hr> | ||
+ | === RELATED WORK BY OTHERS === | ||
+ | ;(A) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShDECK|'''Acceptable Deck''']] | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> |
Revision as of 19:11, 21 October 2019
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (2)Eave Protection Membrane
- Applied beneath the metal valley flashing.
- (3)Shingles (field)
- (4) Metal Counterflashing.
- (5) Metal Edge Flashing (refer to the related Membrane Standards, 10.3.5.2 Metal Edge Terminations).
- (6) Field Membrane (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Asphalt Shingle Systems