Difference between revisions of "Draft CD 6"

Jump to: navigation, search

Difference between revisions of "Draft CD 6"

Line 2: Line 2:
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
|-
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design, with respect to dimensions, the selection of materials and their application, remains the responsibility of the ''Design Authority''.<br><br>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span>
+
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span>
 
|}
 
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">

Revision as of 20:43, 11 February 2020

Notice to Reader
Images used in a Construction Detail are representative and not intended in their representation of an assembly to be prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the RoofStar Guarantee Standards for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

RoofStar Guarantee Standards are blue-linked
SBS Details

SBS 10.3.5.2 Metal Edge Termination.jpg

Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Primer
For self-adhered or torch-applied base membranes, as required by the membrane manufacturer.
(2) Base Membrane (field)
Torch-applied, adhered, self-adhered (as illustrated), or mechanically attached (subject to deck type and wind uplift design requirements). See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
(3) Mastic
Applied beneath metal edge flashing. Refer to 10.3.5.2 (3)(2).
(4) Metal Edge Flashing
See 13.3.2 Fabrication for manufacturing requirements. See also 10.3.5.2 Metal Edge Terminations for application standards and securement. Hemmed edges are required; a kicked-out drip edge is optional but recommended (cf. 13.1.2.2 (10)).
(5) Base Membrane (flashing)
Applied to overlap metal flashing and the field base membrane.
(6) Cap Membrane (field)
Installed according to Part 9 standards and sealed along the exposed edge with an un-tooled bead of membrane compatible sealant (cf. 10.3.5.2 (3)(7)(2)).

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Representative
(B) Wall Assembly
Representative

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.


Back to RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems

Back to SBS Modified Bitumen Construction Details

Back to Construction Details