Difference between revisions of "PVC Conventionally Insulated System (Typical)"
Difference between revisions of "PVC Conventionally Insulated System (Typical)"
(Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...") |
(→RELATED WORK BY OTHERS) |
||
Line 39: | Line 39: | ||
[[RoofStar Guarantee Standards for PVC Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for PVC Membrane Systems]] | [[RoofStar Guarantee Standards for PVC Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for PVC Membrane Systems]] | ||
− | [[PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to '' | + | [[PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Construction Details'']] |
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 19:24, 18 February 2020
RoofStar Guarantee Standards are blue-linked |
PVC Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (4) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (5) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
- (6) Fasteners
- Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
- (7) Membrane Lap
- Thermoplastic membrane may be welded or chemically bonded.
- (8) Metal Cap Flashing
- As required by the RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Sloped Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for PVC Membrane Systems