Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"
Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"
(→RELATED WORK BY OTHERS) |
|||
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> |
Revision as of 21:53, 26 July 2021
RoofStar Guarantee Standards are blue-linked |
EPDM Details
1 WORK INCLUDED
- (1) Vapour Retarder
- If required by design authority.
- (2) Insulation
- Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (4) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (5) Membrane Lap
- Thermoset membrane may be joined using uncured tape or proprietary adhesive.
- (6) Edge Flashing
- Proprietary.
- (7) Membrane Flashing
- Installed according to manufacturer's instructions.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Fascia
- Optional.
- (C) Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for EPDM Membrane Systems