=FIELD MEMBRANES=
+
<li>An Integrity Scan
{| class="wikitable" | style="width: 100%;text-align:center"
+
<ol>
|-
+
<li>must be performed by an RGC-recognized service provider {{hilite | listed in this ''Manual'' || 2021-October-30 }}.
! style="background-color: orange;" | Specifying and Installing materials
+
<li>is required on all ''Waterproofing Systems'', to ensure the waterproofing is leak and damage-free, when ''Overburdens'', amenities or equipment are or will be installed on the completed ''Waterproofing System'' by
|-
+
<ol>
| style="color: black; background-color: #ffffcc; width: 100%;text-align:left" |  The Standards published in this ''Part'' pertain generally to the installation of materials, but are not written to address specific limitations or conditions under which each material may be used. For example, some Accepted materials may be installed without an insulation overlay, whereas other materials require an overlay. Therefore, when designing a ''Waterproofing System'' or installing its materials, the reader is strongly advised to review each [http://rpm.rcabc.org/index.php?title=Division_C:_Accepted_Materials '''Accepted Material'''] under consideration and consult the '''Product Summary''' for published limitations, conditions or restrictions.
+
<li>anyone other than the ''Contractor''.
|}
+
<li>the ''Contractor'' but only when  
 +
<ol>
 +
<li>{{hilite | the total ''Project'' area (footprint), inclusive of planters or other waterproofed features, exceeds 18.58 m2 (200 sf), and || 2021-October-30 }}
 +
<li>the ''Overburdens'', amenities or equipment exceed 150 mm (6”) in depth.
 +
</li></ol>
 +
<li>is not required when the ''Contractor'' installs overburden, amenities or equipment
 +
<ol>
 +
<li>equal to or less than 150 mm (6”) in depth.
 +
<li>{{hilite | the total ''Project'' area (footprint), inclusive of planters or other waterproofed features, is less than 18.58 m2 (200 sf), but the ''Contractor'' must nevertheless protect all membrane-covered surfaces (including walls and parapets) with RoofStar-accepted protection materials immediately after the membrane is installed || 2021-October-30 }}.
 +
</li></ol>
 +
</li></ol>
 +
<br>
 +
See '''Figure 1.1''' for further reference.

Revision as of 19:02, 20 October 2020

  • An Integrity Scan
    1. must be performed by an RGC-recognized service provider listed in this Manual.
    2. is required on all Waterproofing Systems, to ensure the waterproofing is leak and damage-free, when Overburdens, amenities or equipment are or will be installed on the completed Waterproofing System by
      1. anyone other than the Contractor.
      2. the Contractor but only when
        1. the total Project area (footprint), inclusive of planters or other waterproofed features, exceeds 18.58 m2 (200 sf), and
        2. the Overburdens, amenities or equipment exceed 150 mm (6”) in depth.
      3. is not required when the Contractor installs overburden, amenities or equipment
        1. equal to or less than 150 mm (6”) in depth.
        2. the total Project area (footprint), inclusive of planters or other waterproofed features, is less than 18.58 m2 (200 sf), but the Contractor must nevertheless protect all membrane-covered surfaces (including walls and parapets) with RoofStar-accepted protection materials immediately after the membrane is installed.


      See Figure 1.1 for further reference.