Difference between revisions of "ASM Cylindrical Penetration (Flexible Boot Flashing)"
Difference between revisions of "ASM Cylindrical Penetration (Flexible Boot Flashing)"
Line 9: | Line 9: | ||
[[File:8.1.4.8.1.jpg|class=img-responsive]] | [[File:8.1.4.8.1.jpg|class=img-responsive]] | ||
</div> | </div> | ||
− | ::Click below for a printable version of this page | + | ::Click below for a printable version of this page (N/A) |
<div style="width:150px; text-align: left;"> | <div style="width:150px; text-align: left;"> | ||
− | :[[File: | + | :[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> |
Revision as of 16:00, 5 October 2020
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Underlayment
- The type of underlay required is determined by roof slope.
- (2) Insulation
- Offset and stagger layers 300 mm (12").
- (3) Separation layer
- Vapour-permeable layer over insulation, required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels (see 8.1.2 Design).
- (4) Ventilation layer
- Recommended over asphaltic underlays and / or as required in this Standard (see 8.1.2 Design).
- (5) Architectural Metal Roof Panel
- (6) Flange
- Set in two continuous beads of acceptable sealant.
- (7) Preformed Penetration Collar
- (8) High-domed Gasketed Cladding-type Screws
- Flange fastened to manufacturer's specifications.
- (9) Stainless steel drawband
- (10) Sealant
- Apply an acceptable sealant between flashing and penetration. See 11.3.3 (5).
- (11) Water-tight storm collar
- Installed by other trade (new construction only) or as required in this Standard. See 11.3.3 (5).
2 RELATED WORK BY OTHERS
- (A) Pipe penetration
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems