Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> |
Revision as of 22:08, 26 July 2021
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
WORK INCLUDED
- (1) Asphalt Shingles
- Installed to manufacturer’s published instructions and RoofStar Guarantee Standards.
- (2) Apron Flashing
- Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings.
- (3) Step Flashing
- Interwoven with each course of shingles, 75mm (3") head lap.
- (4) Final Step flashing
- Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold.
- (5) Backpan Flashing
- The back-pan is to be extended 100mm (4") beyond the corner and folded. Apply caulking at the transition corner of the final step flashing and back pan.
- (6) Capillary Section
- A capillary tab is to be extended off the end of the back pan to lead water around the corner.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- Proprietary soldered or welded diverter flashing may be used provided they conform to RoofStar Guarantee Standards.
Standard for Asphalt Shingle Systems