Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"
Difference between revisions of "ASM Cylindrical Penetration (Split Panel Flashing)"
(→WORK INCLUDED) |
|||
Line 30: | Line 30: | ||
;(8) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe. | ;(8) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural metal roof panel (lower)''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe. | ||
;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant. | ;(9) Overlap area of lower panel: Penetration flashing is mounted here, set in an acceptable sealant. | ||
− | ;(10) '''Spaced Cleat''': | + | ;(10) '''Spaced Cleat''': Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws. |
;(11) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']] | ;(11) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']] | ||
;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat. | ;(12) '''Architectural metal roof panel (upper)''': Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat. |
Revision as of 13:32, 30 August 2021
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Deck overlay
- Required for continuous support of the underlayment when the deck is not suitable.
- (2) Underlayment
- The type of underlay required is determined by roof slope.
- (3) Insulation
- Offset and stagger layers 300 mm (12").
- (4) Vapour-permeable separation membrane
- Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels/ventilation material (see 8.1.2 Design).
- (5) Ventilation layer
- A ventilation space is required on slopes less than 1:3; entangled mesh (shown) may be used as void fill. The ventilation space facilitates drying as condensation forms on the underside of the metal panels.
- (6) Bearing plate
- Only thermally non-conductive clips or bars passing through the insulation assembly, or mechanically fastened bearing plates, may be used to secure and support insulation panels, or provide support for panel clips.
- (7) Architectural metal panel clip
- (8) Architectural metal roof panel (lower)
- Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
- (9) Overlap area of lower panel
- Penetration flashing is mounted here, set in an acceptable sealant.
- (10) Spaced Cleat
- Discontinuous cleats (to permit drainage), set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
- (11) Sealant
- (12) Architectural metal roof panel (upper)
- Installed after penetration flashing. Cut hole for pipe penetration and turn lower panel end under to hook onto cleat.
- (13) Protrusion Flashing
- Flange set in two continuous beads of accepted caulking.
- (14) Sealant
- Applied around base of penetration flashing.
- (15) Settlement Cap
- Material must match flashing material.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Assemblies