Line 32: | Line 32: | ||
* Electronic Scan two years following completion | * Electronic Scan two years following completion | ||
+ | <hr> | ||
− | |||
− | [[Section:Request RoofStar Guarantees|<i class="fa fa-chevron-circle-right | + | |
+ | [[Section:A. About|<i class="fa fa-chevron-circle-left" ></i> Back to ''About'']] | ||
+ | |||
+ | [[Section:Request RoofStar Guarantees|<i class="fa fa-chevron-circle-right" ></i> ''Requesting and Specifying a RoofStar Guarantees'']] |
Revision as of 18:56, 27 July 2016
Inspections required under the RoofStar Guarantee Program must be conducted by RGC accepted inspectors who are employed by an RGC accepted inspection firm in British Columbia. The inspections required under the RoofStar Guarantee Program are as follows:
RoofStar 5 Year Guarantee
- Inspections based on daily, whenever possible, during the actual roofing application, typically starting with a deck surface inspection
- Inspections based on one inspection for every $25,000.00 during the actual roofing application, typically starting with a deck surface inspection
- Final inspection upon completion
- Written report by independent inspection company
- Roof System Record including Guarantee Certificate & Roof Maintenance Guide
- Re-inspection two years following completion
- Written report presented to owner
RoofStar 10 Year Guarantee
- Inspections based on daily, whenever possible, during the actual roofing application, typically starting with a deck surface inspection
- Final inspection upon completion
- Written report by independent inspection company
- Roof System Record including Guarantee Certificate & Roof Maintenance Guide
- Re-inspection two years following completion
- Written report presented to owner
- Five (5) year roof maintenance inspection
- Eight (8) year roof maintenance inspection
- Written reports presented to owner
RoofStar 5 Year Waterproofing Guarantee (Plaza, Promenade and Terraces)
- Inspections based on daily, whenever possible, during the actual waterproofing membrane installation, typically starting with a deck surface inspection
- Deck surface inspections which include moisture content report by the waterproofing applicator (contractor) on all concrete decks, performed daily prior to waterproofing installations
- Membrane Moisture Survey report confirming watertight integrity of membrane prior to installation of any over burden (with the exception of adhered protection boards)
- Final inspection upon completion
- Written report by independent inspection company
- Waterproofing System Record including Guarantee Certificate & Roof Maintenance Guide
- Electronic Scan two years following completion