Difference between revisions of "SBS Parapet (Typical)"
Difference between revisions of "SBS Parapet (Typical)"
m (James Klassen moved page SBS 10.3.5.1-1 Parapet (typical) to SBS Parapet (Typical)) |
|
(No difference)
|
Revision as of 16:38, 27 June 2022
Division D - Construction Details
SBS | Parapet (Typical) ( Article 10.3.4.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See list of Accepted Materials.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- Mechanically fasten to outside face of parapet blocking (D). At least one ply must extend over outside edge.
- (7) Metal Base Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (8) Metal Cap Flashing
- Flashings 1 and 2 may be one piece. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Steel Deck Structure
- (B) Air/Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.