Difference between revisions of "Working Page 9"
Difference between revisions of "Working Page 9"
Line 8: | Line 8: | ||
<div class="col-md-2"> | <div class="col-md-2"> | ||
− | :[[File:VRA Construction Details page thumb.jpg | link=http://rpm.rcabc.org/images/6/62/SBS_Systems_page_thumb.JPG | | + | :[[File:VRA Construction Details page thumb.jpg | link=http://rpm.rcabc.org/images/6/62/SBS_Systems_page_thumb.JPG |225 px]] |
</div> | </div> | ||
Revision as of 14:57, 14 August 2024
- Division D - Construction Details
- Construction Details for Vegetated Roof Assemblies
- The drawings linked on this page are intended to represent a variety of vegetated roof assembly design and construction requirements, as these correspond to the Parts of the Standard for Vegetated Roof Assemblies. The drawings do not represent all possible variations. To ensure a project will qualify for a RoofStar Guarantee for Vegetated Roof Assemblies, consult the specifications, design requirements, and construction details published by each vegetated roof system manufacturer, seek the advice of a green roof design professional, and refer to the Standard for Vegetated Roof Assemblies.
Part 1 - General
Under Development
Part 2 - Structural Support and Safety
Under Development
Part 5 - Protection of the Roof Assembly
Under Development
Part 6 - Water Management
Under Development
Part 7 - Growing Media (Vegetation Support)
Under Development
Part 8 - Irrigation
Under Development
Part 9 - Seeds, Plants, and Vegetation
Under Development
Part 10 - Installation of Vegetated Roof Systems
Under Development
PART 14 - Landscaped Features and Amenity Spaces
Under Development
Standard for Vegetated Roof Assemblies
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.