Difference between revisions of "SBS Roof System Details"

Jump to: navigation, search

Difference between revisions of "SBS Roof System Details"

Line 20: Line 20:
 
:[[SBS Details:D1.7.15 Counter-flashings & Reglets (Window Curb)|D1.7.15 Counter-flashings & Reglets (Window Curb)]]
 
:[[SBS Details:D1.7.15 Counter-flashings & Reglets (Window Curb)|D1.7.15 Counter-flashings & Reglets (Window Curb)]]
 
:[[SBS Details:D1.7.16 Roof-Wall Transitions (Expansion Joint)|D1.7.16 Roof-Wall Transitions (Expansion Joint)]]
 
:[[SBS Details:D1.7.16 Roof-Wall Transitions (Expansion Joint)|D1.7.16 Roof-Wall Transitions (Expansion Joint)]]
:[[SBS Details:D1.7.17 Roof-Wall Transitions (Divider/Joint)|D1.7.17 Roof-Wall Transitions (Divider/Joint)]]
+
:[[SBS Details:D1.7.17 Roof-Wall Transitions (Divider/Joint)|D1.7.17 Roof-Wall Transitions (Divider/Control Joint)]]
 
:[[SBS Details:D1.7.18 Roof-Wall Transitions (Fire Separation Joint)|D1.7.18 Roof-Wall Transitions (Fire Separation Joint)]]
 
:[[SBS Details:D1.7.18 Roof-Wall Transitions (Fire Separation Joint)|D1.7.18 Roof-Wall Transitions (Fire Separation Joint)]]
 
:[[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|D1.7.19 Roof-Wall Transitions (Fire Separation Wall)]]
 
:[[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|D1.7.19 Roof-Wall Transitions (Fire Separation Wall)]]

Revision as of 16:04, 19 July 2016

The drawings contained within this section are intended to represent a variety of modified bituminous roof system designs while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RGC Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.

For further information about flexible membrane system designs, see Section 2.1.3 Guarantee standards for Flexible Membrane Roofing Systems, Section 5 Flexible Membrane Roofing Systems and Section 8 Construction Details.


D1.7.1 Assemblies (Insulated Conventional)
D1.7.2 Assemblies (Protected Membrane)
D1.7.3 Parapets & Copings (Low Parapet - Wall Supported)
D1.7.4 Parapets & Copings (Low Parapet - Unsupported by Wall)
D1.7.5 Parapets & Copings (High Parapet - Wall Supported)
D1.7.6 Parapets & Copings (Parapet - Wall Transition)
D1.7.7 Edges & Fascia (Cant Edge)
D1.7.8 Edges & Fascia (Gravel Stop)
D1.7.9 Counter-flashings & Reglets (Deck - Wall Supported)
D1.7.10 Counter-flashings & Reglets (Deck - Unsupported by Wall)
D1.7.11 Counter-flashings & Reglets (Stucco Wall: Re-roofing)
D1.7.12 Counter-flashings & Reglets (Stucco Wall: New)
D1.7.13 Counter-flashings & Reglets (Double Surface Reglet)
D1.7.14 Counter-flashings & Reglets (Low Door Sill)
D1.7.15 Counter-flashings & Reglets (Window Curb)
D1.7.16 Roof-Wall Transitions (Expansion Joint)
D1.7.17 Roof-Wall Transitions (Divider/Control Joint)
D1.7.18 Roof-Wall Transitions (Fire Separation Joint)
D1.7.19 Roof-Wall Transitions (Fire Separation Wall)
D1.7.20 Curbs & Sleepers (Equipment Sleeper)
D1.7.21 Curbs & Sleepers (Multiple Roof Penetrations)
D1.7.22 Curbs & Sleepers (Basic Curb)
D1.7.23 Curbs & Sleepers (Mechanical Opening)
D1.7.24 Curbs & Sleepers (Pre-curb for Planters)
D1.7.25 Strip-in Flashings (Metal Plumbing)
D1.7.26 Strip-in Flashings (Two-part Cable)
D1.7.27 Strip-in Flashings (Gum Pan/Pitch Pocket)
D1.7.28 Water & Drainage (Cast Iron Drain)
D1.7.29 Water & Drainage (Spun Copper Drain)
D1.7.30 Water & Drainage (Clamping Spun Copper Drain)
D1.7.31 Water & Drainage (Open Wall Scupper)
D1.7.32 Water & Drainage (Through-wall Scupper)
D1.7.33 Miscellaneous Penetrations (Roof Anchor)
D1.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)
D1.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)
D1.7.36 Miscellaneous Penetrations (Guardrails)


Back to SBS Roof Systems

Go to Construction Details Section for all Roof Systems and Waterproofing