;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Edge/Gravel-stop Flashing''']]: Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
 
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Edge/Gravel-stop Flashing''']]: Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
 
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.
 
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.
;(8) <b>Asphalt:</b> For asphalt and gravel built-up roofing systems only.
+
;(8) '''Asphalt''':  For asphalt and gravel built-up roofing systems only.
;(9) <b>Gravel:</b>  For asphalt and gravel built-up roofing systems only.
+
;(9) '''Gravel''': For asphalt and gravel built-up roofing systems only.
  
 
<hr>
 
<hr>

Revision as of 19:05, 4 August 2016

10.3.2.2.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority
(2) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Where required.
(4) Primary Membrane and Membrane Protection
Mechanically fasten to outside face of fascia (C).
(5) Mastic
Trowel coating of compatible mastic.
(6) Metal Edge/Gravel-stop Flashing
Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
(7) Membrane Flashing
Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.
(8) Asphalt
For asphalt and gravel built-up roofing systems only.
(9) Gravel
For asphalt and gravel built-up roofing systems only.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Blocking
(C) Wood Fascia

NOTE: Refer to RGC Guarantee Standards for additional requirements.