Difference between revisions of "SBS Sealant Pocket"
Difference between revisions of "SBS Sealant Pocket"
(→RELATED WORK BY OTHERS) |
|||
Line 1: | Line 1: | ||
− | [[File:10.3.5.4.jpg]] | + | <div class="panel panel-success"> |
+ | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:10.3.5.4.jpg|class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority. | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority. | ||
Line 20: | Line 28: | ||
;(B) '''Protrusion''' | ;(B) '''Protrusion''' | ||
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']] | ;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']] | ||
− | + | </div><!-- COL-6-MD --> | |
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. |
Revision as of 18:08, 19 August 2016
SBS Details
1 WORK INCLUDED
- (1) Gypsum Deck Overlay
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority
- (3) Insulation
- Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Compatible Mastic
- Use only the membrane manufacturer's approved sealant.
- (7) Gum Pan or Pitch Pocket
- Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
- (8) Membrane Flashing
- Onto primed metal flashing flange.
- (9) Packing
- To prevent displacement of compatible mastic.
- (10) Structural Sealant
- Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant.
- (11) Back-up Storm Collar
- To be installed whenever practical. Caulk at top of collar.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Protrusion
- (C) Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
- AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing or Curbed Opening (See Section 10.3).