Difference between revisions of "EPDM Roof System Details"
Difference between revisions of "EPDM Roof System Details"
Line 38: | Line 38: | ||
:[[EPDM Details:D2.7.27 Water & Drainage (Cast Iron Drain)|D2.7.27 Water & Drainage (Cast Iron Drain)(Under Construction)]] | :[[EPDM Details:D2.7.27 Water & Drainage (Cast Iron Drain)|D2.7.27 Water & Drainage (Cast Iron Drain)(Under Construction)]] | ||
:[[EPDM Details:D2.7.28 Water & Drainage (Spun Copper Drain)|D2.7.28 Water & Drainage (Spun Copper Drain)(Under Construction)]] | :[[EPDM Details:D2.7.28 Water & Drainage (Spun Copper Drain)|D2.7.28 Water & Drainage (Spun Copper Drain)(Under Construction)]] | ||
− | + | :[[EPDM Details:D2.7.30 Water & Drainage (Open Wall Scupper)|D2.7.30 Water & Drainage (Open Wall Scupper)(Under Construction)]] | |
− | :[[EPDM Details:D2.7. | + | :[[EPDM Details:D2.7.31 Water & Drainage (Through-wall Scupper)|D2.7.31 Water & Drainage (Through-wall Scupper)(Under Construction)]] |
− | :[[EPDM Details:D2.7. | + | :[[EPDM Details:D2.7.32 Miscellaneous Penetrations (Roof Anchor)|D2.7.32 Miscellaneous Penetrations (Roof Anchor)(Under Construction)]] |
− | :[[EPDM Details:D2.7. | + | :[[EPDM Details:D2.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D2.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)]] |
− | :[[EPDM Details:D2.7. | + | :[[EPDM Details:D2.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D2.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)]] |
− | :[[EPDM Details:D2.7. | ||
<hr> | <hr> |
Revision as of 18:49, 8 August 2016
The drawings contained within this section are intended to represent a variety of thermoset membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
For further information about thermoset membrane (EPDM) system designs and requirements, see EPDM (Thermoset Membranes) Roof Systems.
- D2.7.1 Assemblies (Insulated Conventional)
- D2.7.2 Assemblies (Fully Adhered)
- D2.7.3 Assemblies (Ballasted Protected Membrane)
- D2.7.21 Curbs & Sleepers (Basic Curb)
- D2.7.22 Curbs & Sleepers (Mechanical Opening)
- D2.7.25 Strip-in Flashings (Two-part Cable)
- D2.7.29 Water & Drainage (Clamping Spun Copper Drain)
- NOTE: The following pages are currently under construction
- D2.7.4 Parapets & Copings (High - Wall Supported)(Under Construction)
- D2.7.5 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D2.7.6 Edges & Fascia (Cant Edge)(Under Construction)
- D2.7.7 Edges & Fascia (Gravel Stop)(Under Construction)
- D2.7.8 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D2.7.9 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D2.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D2.7.11 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D2.7.12 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D2.7.13 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D2.7.14 Counter-flashings & Reglets (Window Curb)(Under Construction)
- D2.7.15 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D2.7.16 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D2.7.17 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D2.7.18 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D2.7.19 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D2.7.20 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D2.7.23 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
- D2.7.24 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D2.7.26 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D2.7.27 Water & Drainage (Cast Iron Drain)(Under Construction)
- D2.7.28 Water & Drainage (Spun Copper Drain)(Under Construction)
- D2.7.30 Water & Drainage (Open Wall Scupper)(Under Construction)
- D2.7.31 Water & Drainage (Through-wall Scupper)(Under Construction)
- D2.7.32 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
- D2.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
- D2.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)