Difference between revisions of "ASM Eave and Rake Edges (Snap-Lock Seams)"

Jump to: navigation, search

Difference between revisions of "ASM Eave and Rake Edges (Snap-Lock Seams)"

Line 1: Line 1:
[[File:8.1.4.4.1.jpg]]
+
<div class="panel panel-success">
 
+
<div class="panel-heading"><big>'''ASM Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:8.1.4.4.1.jpg|class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMICE|'''Ice and Water Protection''']]: Accepted self-adhered modified bituminous membrane.
 
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMICE|'''Ice and Water Protection''']]: Accepted self-adhered modified bituminous membrane.
Line 19: Line 26:
 
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
 
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
 
;(B) '''Fascia Board'''  
 
;(B) '''Fascia Board'''  
 
+
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
  

Revision as of 20:27, 19 August 2016

ASM Details

8.1.4.4.1.jpg

1 WORK INCLUDED

(1) Ice and Water Protection
Accepted self-adhered modified bituminous membrane.
(2) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal panel manufacturer.
(3) Metal Panel Clip
Installed to metal roof panel manufacturer's printed instructions.
(4) Architectural Metal Roof Panel
(5) Continuous Metal Cleat
(6) Metal Fascia Flashing
(7) Edge Metal Flashing (Continuous)
(8) Pre-formed Closures
(9) Exposed Fasteners
High-domed gasketed cladding type screws compatible with metal roof panel.
(10) Rake Edge Metal Flashing

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia Board


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to ASM Application

Back to ASM Construction Details

Back to Construction Details