Difference between revisions of "ASM Valley (Hooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Hooked)"

Line 1: Line 1:
 +
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 +
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
 +
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>
 
<div class="panel-heading"><big>'''ASM Details'''</big></div>

Revision as of 15:01, 1 September 2016

RoofStar Guarantee Standards are blue-linked
ASM Details

1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(4) Valley Metal Panel
Preformed with centre rib and built-in continuous lock.
(5) Fastening
Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
(6) Membrane Strip-in
Accepted self-adhered modified bituminous eave protection membrane.
(7) Architectural Metal Roof Panel
(8) Continuous Built-In Hook Strip
(9) Valley Panel Overlap
Set in two continuous rows of accepted caulking or sealant tape.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to ASM Application

Back to ASM Construction Details

Back to Construction Details