Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

Jump to: navigation, search

Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

Line 1: Line 1:
 +
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 +
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
 +
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
 
<div class="panel-heading"><big>'''EPDM Details'''</big></div>

Revision as of 22:17, 31 August 2016

RoofStar Guarantee Standards are blue-linked
EPDM Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoset membrane may be joined using uncured tape or proprietary adhesive.
(6) Edge Flashing
Proprietary.
(7) Membrane Flashing
Installed according to manufacturer's instructions.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia
Optional.
(C) Wood Blocking


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to EPDM Application

Back to EPDM Construction Details

Back to Construction Details