Difference between revisions of "LMF Metal Cap Flashing (joints)"
Difference between revisions of "LMF Metal Cap Flashing (joints)"
Line 1: | Line 1: | ||
+ | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
+ | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | ||
+ | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''Metal Flashing Details'''</big></div> | <div class="panel-heading"><big>'''Metal Flashing Details'''</big></div> | ||
Line 13: | Line 16: | ||
(1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable. | (1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable. | ||
− | (2) <b>Underlayment:</b> Membrane under cap flashing. See | + | (2) <b>Underlayment:</b> Membrane under cap flashing. See, for example, [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPTERM|'''SBS Roof Systems, 10.3 Application''']]. |
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips. | (3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips. | ||
− | (4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See | + | (4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 12. Perimeter Flashing: Metal''']]. |
+ | |||
+ | (5) <b>Metal Cap Flashing: </b>Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 12. Perimeter Flashing: Metal''']]. | ||
− | |||
Revision as of 16:33, 1 September 2016
RoofStar Guarantee Standards are blue-linked |
END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:
(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
(2) Underlayment: Membrane under cap flashing. See, for example, SBS Roof Systems, 10.3 Application.
(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See SBS Roof Systems - 12. Perimeter Flashing: Metal.
(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See SBS Roof Systems - 12. Perimeter Flashing: Metal.
Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.