Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Line 32: | Line 32: | ||
− | [[ | + | [[RoofStar Guarantee Standards for Asphalt Shingles Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Asphalt Shingles Roof Systems]] |
[[Asphalt Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | [[Asphalt Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | ||
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:51, 25 October 2016
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
WORK INCLUDED
- (1) Asphalt Shingles
- Installed to manufacturer’s published instructions and RGC Guarantee Standards.
- (2) Apron Flashing
- Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings.
- (3) Step Flashing
- Interwoven with each course of shingles, 75mm (3") head lap.
- (4) Final Step flashing
- Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold.
- (5) Backpan Flashing
- The back-pan is to be extended 100mm (4") beyond the corner and folded. Apply caulking at the transition corner of the final step flashing and back pan.
- (6) Capillary Section
- A capillary tab is to be extended off the end of the back pan to lead water around the corner.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- Proprietary soldered or welded diverter flashing may be used provided they conform to RoofStar Guarantee Standards.
RoofStar Guarantee Standards for Asphalt Shingles Roof Systems