Difference between revisions of "ASM Valley (Hooked)"
Difference between revisions of "ASM Valley (Hooked)"
Line 35: | Line 35: | ||
− | + | [[RoofStar Guarantee Standards for ASM Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Systems]] | |
− | [[ | ||
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']] | [[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']] | ||
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:42, 25 October 2016
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Valley Protection Membrane
- Accepted self-adhered modified bituminous eave protection membrane.
- (2) Underlayment
- The type of underlay required is determined by roof slope.
- (3) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (4) Valley Metal Panel
- Preformed with centre rib and built-in continuous lock.
- (5) Fastening
- Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
- (6) Membrane Strip-in
- Accepted self-adhered modified bituminous eave protection membrane.
- (7) Architectural Metal Roof Panel
- (8) Continuous Built-In Hook Strip
- (9) Valley Panel Overlap
- Set in two continuous rows of accepted caulking or sealant tape.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Systems