Difference between revisions of "ASM Roof-Wall Connection (Head-wall, Vented)"
Difference between revisions of "ASM Roof-Wall Connection (Head-wall, Vented)"
Line 40: | Line 40: | ||
− | [[ | + | [[RoofStar Guarantee Standards for ASM Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Systems]] |
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']] | [[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']] | ||
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:46, 25 October 2016
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Underlayment
- The type of underlay required is determined by roof slope.
- (2) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (3) Architectural Metal Roof Panel
- Turned up (bread panned) at termination.
- (4) Metal Panel Clip
- installed to metal roof manufacturer’s printed instructions
- (5) 'Z' Closure
- set in accepted caulking and secured with compatible, non-corrosive flat head fasteners.
- (6) Manufactured plastic louvres
- (7) Exposed Fasteners
- High domed, gasketed cladding type screw compatible with metal roof panel.
- (8) Metal Base Flashing
- Must extend 200 mm (8") over metal roof panel. Lap joints must be sealed with two rows of accepted caulking. Exposed edges to be turned under.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wood Nailer
- (C) Free Vent Area
- (D) Wall
- (E) Building Paper
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Systems