Difference between revisions of "TPO Conventionally Insulated System (Typical)"

Jump to: navigation, search

Difference between revisions of "TPO Conventionally Insulated System (Typical)"

Line 13: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;1) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness  or when required as a thermal barrier by design authority.
+
;1) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness  or when required as a thermal barrier by design authority.
;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
;(3) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
+
;(3) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
;(4) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
+
;(4) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
;(5) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#TPOSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
+
;(5) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
 
;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
 
;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
 
;(7) '''Membrane Lap''': Thermoplastic membrane may be welded or chemically bonded.
 
;(7) '''Membrane Lap''': Thermoplastic membrane may be welded or chemically bonded.
;(8) [[RoofStar Guarantee Standards for TPO/PVC Roof Systems#METALCAP-TPO|'''Metal Cap Flashing''']]: As required by the ''RoofStar Guarantee Standards''.
+
;(8) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#METALCAP-TPO|'''Metal Cap Flashing''']]: As required by the ''RoofStar Guarantee Standards''.
  
 
<hr>
 
<hr>
Line 33: Line 33:
  
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
  
 
<hr>
 
<hr>
  
  
 
+
[[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for TPO/PVC Roof Assemblies]]
[[RoofStar Guarantee Standards for TPO/PVC Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for TPO/PVC Roof Systems]]
 
  
 
[[TPO, PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO/PVC Construction Details'']]
 
[[TPO, PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO/PVC Construction Details'']]
  
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 16:52, 23 October 2017

RoofStar Guarantee Standards are blue-linked
TPO/PVC Details

6.3.1.1.jpg

1 WORK INCLUDED

1) Gypsum Deck Overlay
May be required depending on insulation thickness or when required as a thermal barrier by design authority.
(2) Insulation
Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(4) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(5) Membrane Flashing
Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
(6) Fasteners
Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
(7) Membrane Lap
Thermoplastic membrane may be welded or chemically bonded.
(8) Metal Cap Flashing
As required by the RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Parapet Surface
Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
(C) Sloped Wood Blocking

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for TPO/PVC Roof Assemblies

Back to TPO/PVC Construction Details

Back to Construction Details