Difference between revisions of "ASM Eave and Rake Edges (Mechanical Seams)"

Jump to: navigation, search

Difference between revisions of "ASM Eave and Rake Edges (Mechanical Seams)"

(RELATED WORK BY OTHERS)
Line 32: Line 32:
  
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
  
 
<hr>
 
<hr>
  
  
 
+
[[RoofStar Guarantee Standards for ASM Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Assemblies]]
[[RoofStar Guarantee Standards for ASM Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Systems]]
 
  
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 17:34, 23 October 2017

RoofStar Guarantee Standards are blue-linked
ASM Details

ASM 10.1.1 Eave and Rake Flashing (Mechanical Seam).jpg

1 WORK INCLUDED

(1) Ice and Water Protection
Accepted self-adhered modified bituminous membrane.
(2) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal panel manufacturer.
(3) Metal Panel Clip
Installed to metal roof panel manufacturer’s printed instructions.
(4) Architectural Metal Roof Panel
(5) Continuous Metal Cleat
(6) Metal Fascia Flashing
(7) Edge Metal Flashing (Continuous)

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Nailer
(C) Fascia Board

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for ASM Roof Assemblies

Back to ASM Construction Details

Back to Construction Details