Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"

Jump to: navigation, search

Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"

Line 14: Line 14:
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
(1)<b> Underlayment:</b> RGC Accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.
+
(1)<b> Underlayment:</b> RoofStar-accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.
  
 
(2)<b> Wood Battens or Strapping: </b>Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing.
 
(2)<b> Wood Battens or Strapping: </b>Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing.
Line 31: Line 31:
  
 
NOTE:  
 
NOTE:  
*Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
*Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
  
 
<hr>
 
<hr>
  
  
 
+
[[RoofStar Guarantee Standards for Tile & Slate Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Assemblies]]
[[RoofStar Guarantee Standards for Tile & Slate Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Systems]]
 
  
 
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']]
 
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:13, 23 October 2017

RoofStar Guarantee Standards are blue-linked
Tile Roofing Details

7.3.3.1.jpg

1 WORK INCLUDED

(1) Underlayment: RoofStar-accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.

(2) Wood Battens or Strapping: Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing.

(3) Wood Battens (Purlins): Treated battens 38 mm x 38 mm (1.5" x 1.5") applied over batten or strapping using non-corrosive fasteners. Install perpendicular to slope, spacing determined by manufacturers specification.

(4) Metal Facia: Shop built or manufacturers accepted proprietary eave flashing installed to cover open space between furring battens at facia.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE:

  • Refer to RoofStar Guarantee Standards for additional requirements.


RoofStar Guarantee Standards for Tile & Slate Roof Assemblies

Back to Tile and Slate Construction Details

Back to Construction Details