Difference between revisions of "LMF Metal Cap Flashing (joints)"
Difference between revisions of "LMF Metal Cap Flashing (joints)"
Line 40: | Line 40: | ||
<hr> | <hr> | ||
− | |||
− | |||
[[Metal Flashing Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Metal Flashing Details'']] | [[Metal Flashing Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Metal Flashing Details'']] | ||
− | [[ | + | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:21, 23 October 2017
RoofStar Guarantee Standards are blue-linked |
END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:
(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
(2) Underlayment: Membrane under cap flashing. See, for example, SBS Roof Systems, 10.3 Application.
(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using screws and clips.
(4) Fasteners: S-locks and Double S-locks are screwed through the single leaf before applying the following length. See SBS Roof Systems - 13. Perimeter Flashing: Metal.
(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See SBS Roof Systems - 13. Perimeter Flashing: Metal.
Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in the RoofStar Guarantee Standards sections of any of the Low Slope Membrane Roof Systems sections.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.