Difference between revisions of "Securing the Roof Assembly"

Jump to: navigation, search

Difference between revisions of "Securing the Roof Assembly"

Line 6: Line 6:
  
 
   <div class="col-md-9" id="mainBodyDiv">
 
   <div class="col-md-9" id="mainBodyDiv">
{{Template:Wind Uplift Design and CSA A123.21}}
+
 
 +
'''This page is currently under reconstruction'''. 
 +
 
 +
To understand the design process illustrated in the flow chart below, see [http://rpm.rcabc.org/index.php/RoofStar_Guarantee_Standards_for_SBS_Modified_Bitumen_Roof_Assemblies#SBSWIND '''SECURING the ROOF ASSEMBLY'''] as part of the RoofStar Guarantee Standards for SBS-modified Bitumen Roof Assemblies.
 +
{| class="wikitable" | style="margin-left: 0px; margin-right: 0px; border: none;"
 +
|-
 +
| [[File:Figure 3.3.jpg|400 px]]
 +
|}
  
 
<hr>
 
<hr>

Revision as of 21:39, 9 November 2018

This page is currently under reconstruction.

To understand the design process illustrated in the flow chart below, see SECURING the ROOF ASSEMBLY as part of the RoofStar Guarantee Standards for SBS-modified Bitumen Roof Assemblies.

Figure 3.3.jpg


Low Slope Membrane Roofs

Home