Difference between revisions of "ASM Valley (Hooked)"
Difference between revisions of "ASM Valley (Hooked)"
m (James Klassen moved page ASM 10.11 Hooked Valley Flashing to ASM 10.3.1 Hooked Valley Flashing) |
|||
Line 12: | Line 12: | ||
<div style="width:150px; text-align: left;"> | <div style="width:150px; text-align: left;"> | ||
− | :[[File:ASM 10. | + | :[[File:ASM 10.3.1 Thumb for PDF.jpg|100 px|link=http://rpm.rcabc.org/images/7/7d/ASM_10.11_Hooked_Valley_Flashing.pdf|'''Print Sheet''']] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> |
Revision as of 17:30, 26 April 2019
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Architectural Metal Roof Panel
- (2) Valley Panel Overlap
- Set in two continuous rows of accepted caulking or sealant tape.
- (3) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (4) Underlayment
- The type of underlay required is determined by roof slope.
- (5) Membrane Strip-in
- Accepted self-adhered modified bituminous eave protection membrane.
- (6) Continuous Built-In Hook Strip
- (7) Fastening
- Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
- (8) Valley Protection Membrane
- Accepted self-adhered modified bituminous eave protection membrane.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Assemblies