Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"
Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"
(→WORK INCLUDED) |
|||
Line 11: | Line 11: | ||
|+ Click on any image to expand it | |+ Click on any image to expand it | ||
|- | |- | ||
− | | [[File:ASh 10.7.2-1 CD.jpg| class=img-responsive | link=http://rpm.rcabc.org/images/e/ef/ | + | | [[File:ASh 10.7.2-1 CD.jpg| class=img-responsive | link=http://rpm.rcabc.org/images/e/ef/ASh 10.7.2-1 CD.jpg]] |
|- | |- | ||
− | | [[File:ASh 10.7.2-2 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/e/ed/ | + | | [[File:ASh 10.7.2-2 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/e/ed/ASh 10.7.2-2 CD.jpg]] |
|} | |} | ||
</div> | </div> |
Revision as of 16:17, 4 December 2019
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (2) Shingles (field)
- (3) Field Shingles
- Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the Waterproofing roof system.
- (4) Field Membrane
- Secure membrane to Water-shedding roof deck at least 300 mm (12") above the finished surface of the Waterproofing roof (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Asphalt Shingle Systems