Difference between revisions of "SBS Parapet (Independent of Roof Structure)"

Jump to: navigation, search

Difference between revisions of "SBS Parapet (Independent of Roof Structure)"

(No difference)

Revision as of 17:17, 5 December 2019

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.1.2.jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
(4) Insulation Overlay
As required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing
Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge.
(7) Metal Base Flashing
Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.
(8) Metal Cap Flashing
Flashings 7 and 8 may be one piece. See Section 14. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See Section 13.3 - Attachment.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Air and Vapour Control Layer Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Flexible Insulation
(F) Sloped Wood Blocking
Required over 100 mm (4") parapet width.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details