Difference between revisions of "Draft CD 4"

Jump to: navigation, search

Difference between revisions of "Draft CD 4"

(Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...")
 
Line 7: Line 7:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:10.2.1.jpg|class=img-responsive]]
+
[[File:SBS 1.3.1-3 PMRA.jpg|class=img-responsive]]
 
</div>
 
</div>
</div><!-- COL-MD-6 -->
 
  
<div class="col-md-6">
 
<b><i>END JOINTS</i></b> in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:
 
  
(1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
+
::Click below for a printable version of this page.
  
(2) <b>Underlayment:</b> Membrane under cap flashing. See, for example, [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPTERM|'''SBS Roof Systems, 10.3 Application''']].
+
<div style="width:150px; text-align: left;">
 +
:[[File:Pdf.png|100 px|link=|'''Print Sheet''']]
 +
</div>
  
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using {{strike| nails || 2017-September-28 }} {{hilite | screws || 2017-September-28 }} and clips.
+
</div><!-- COL-MD-6 -->
 +
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSMEMBRANES|'''Base Membrane (field)''']]: See Tables '''9.1''' and '''9.2''' for acceptable membrane types and application methods.
 +
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPERIMETERS|'''Base Membrane (flashing)''']]: Carried vertically up a wall or parapet (membrane flashing must extend up the vertical plane, and above the ''Finished Roof/Waterproofing Surface'', at least 200 mm (8”), and must extend onto the roof field at least 100 mm (4”) (greater if required by the membrane manufacturer).
 +
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSMEMBRANES|'''Cap Membrane (field)''']]: May be an ungranulated base membrane when protected from UV light.  See Tables '''9.1''' and '''9.2''' for acceptable ‘film’ cap membrane types.
 +
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPERIMETERS|'''Cap Membrane (flashing)''']]: Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.  Membrane flashing must be protected from UV light exposure; use a granulated surface membrane (as illustrated) or cover with metal flashing.  Terminate membrane following the requirements in '''10.1.2.2''' ('''16''').  For perimeters that require hot works-specific applications, see '''10.3.3 Alternate Membrane Flashing Approaches'''.
 +
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTED|'''Drainage Layer''']]: Required below XPS insulation in a PMRA (an additional drainage layer is sometimes required above the insulation.  See '''14.1.2.1''' ('''5''')('''4''').  In all other cases, a second drainage layer above the insulation is discretionary).  Turn the drainage layer up at the perimeter to convey water to the drains.
 +
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONMATERIALS|'''Insulation''']]: XPS insulation, ideally installed in multiple layers that are offset and staggered as illustrated (for both system stability and thermal effectiveness).
 +
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTED|'''Filter Fabric''']]: Installed above XPS insulation, and tucked behind the base metal flashing, to contain insulation and prevent ‘stacking’ (see '''12.1.1''' ('''1''')('''3''')('''1''')), and to prevent fine material from settling down to the membrane ('''12.1.1''' ('''1''')('''3''')('''2''')).
 +
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTED|'''Ballast''']]: Considered part of the roof system (ballast functions as securement against both flotation and wind uplift), ballast must be installed by the Contractor (see '''Section 12.1''').  This requirement is waived when a ''Vegetated Roof System'' (VRS) that is installed by others serves as ballast (see '''12.1.3.1''' ('''1''')); in such situations, the VRS must be installed immediately after the Contractor’s work and coordinated with the Contractor to ensure the roof system remains unaffected by wind or flotation and is not damaged by others.  See also '''1.6 RoofStar Guarantee: Coverage and Limitations''' concerning integrity scans when overburden is installed by someone other than the Contractor ('''1.6''' ('''6''')).
 +
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSMETALBASE|'''Metal Base Flashing''']]: Fabricated and secured according to the requirements in Part '''13 METAL FLASHINGS'''.
  
(4) <b>Fasteners: </b>S-locks and Double S-locks are {{strike| nailed || 2017-September-28 }} {{hilite | screwed || 2017-September-28 }} through the single leaf before applying the following length. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 13. Perimeter Flashing: Metal''']].
+
<hr>
  
(5) <b>Metal Cap Flashing: </b>Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 13. Perimeter Flashing: Metal''']].
+
=== RELATED WORK BY OTHERS ===
 
+
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']]:
 
+
;(B)  Suitable Wall Sheathing: If and as required.
 
+
;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSLOPEDWOODBLOCKING|'''Sloped Parapet Top''']]:Sloped to roof where parapet is over 100 mm (4") in width.
Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in the '''''RoofStar Guarantee Standards''''' sections of any of the Low Slope Membrane Roof Systems sections.
+
;(D) Wall or Parapet Structure
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
Line 32: Line 42:
  
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 +
  
 
<hr>
 
<hr>
  
  
[[Metal Flashing Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Metal Flashing Details'']]
+
[[RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems'']]
 +
 
 +
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
  
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 19:08, 11 February 2020

RoofStar Guarantee Standards are blue-linked
Metal Flashing Details

SBS 1.3.1-3 PMRA.jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Base Membrane (field)
See Tables 9.1 and 9.2 for acceptable membrane types and application methods.
(2) Base Membrane (flashing)
Carried vertically up a wall or parapet (membrane flashing must extend up the vertical plane, and above the Finished Roof/Waterproofing Surface, at least 200 mm (8”), and must extend onto the roof field at least 100 mm (4”) (greater if required by the membrane manufacturer).
(3) Cap Membrane (field)
May be an ungranulated base membrane when protected from UV light. See Tables 9.1 and 9.2 for acceptable ‘film’ cap membrane types.
(4) Cap Membrane (flashing)
Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge. Membrane flashing must be protected from UV light exposure; use a granulated surface membrane (as illustrated) or cover with metal flashing. Terminate membrane following the requirements in 10.1.2.2 (16). For perimeters that require hot works-specific applications, see 10.3.3 Alternate Membrane Flashing Approaches.
(5) Drainage Layer
Required below XPS insulation in a PMRA (an additional drainage layer is sometimes required above the insulation. See 14.1.2.1 (5)(4). In all other cases, a second drainage layer above the insulation is discretionary). Turn the drainage layer up at the perimeter to convey water to the drains.
(6) Insulation
XPS insulation, ideally installed in multiple layers that are offset and staggered as illustrated (for both system stability and thermal effectiveness).
(7) Filter Fabric
Installed above XPS insulation, and tucked behind the base metal flashing, to contain insulation and prevent ‘stacking’ (see 12.1.1 (1)(3)(1)), and to prevent fine material from settling down to the membrane (12.1.1 (1)(3)(2)).
(8) Ballast
Considered part of the roof system (ballast functions as securement against both flotation and wind uplift), ballast must be installed by the Contractor (see Section 12.1). This requirement is waived when a Vegetated Roof System (VRS) that is installed by others serves as ballast (see 12.1.3.1 (1)); in such situations, the VRS must be installed immediately after the Contractor’s work and coordinated with the Contractor to ensure the roof system remains unaffected by wind or flotation and is not damaged by others. See also 1.6 RoofStar Guarantee: Coverage and Limitations concerning integrity scans when overburden is installed by someone other than the Contractor (1.6 (6)).
(9) Metal Base Flashing
Fabricated and secured according to the requirements in Part 13 METAL FLASHINGS.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Suitable Wall Sheathing
If and as required.
(C) Sloped Parapet Top
Sloped to roof where parapet is over 100 mm (4") in width.
(D) Wall or Parapet Structure

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems

Back to SBS Modified Bitumen Construction Details

Back to Construction Details