Revision as of 18:36, 18 February 2020

Notice to Reader
Images used in a Construction Detail are representative and not intended in their representation of an assembly to be prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the RoofStar Guarantee Standards for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of applicable RoofStar Guarantee Standards may be read by using the blue hyperlinks
SBS Details

SBS 11.3.3.3-2 2-Part Cable 1.jpg

SBS 11.3.3.3-2 2-Part Cable 2.jpg

Click below for a printable version of this page (under development)
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
Optional, depending upon deck condition and roof system requirements.
(2) Air or Vapour Control Layer
Installed following the requirements of Part 6 in this Standard. Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure (2a).
(3) Insulation
Installed in staggered and offset layers, and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on Part 3 of the RoofStar Guarantee Standards for the membrane system type.
(4) Insulation Overlay
Subject to the requirements of Part 8 in the RoofStar Guarantee Standards for the membrane system type.
(5) Field Membrane (field)
Mechanically attached, torch-applied, adhered (shown) or self-adhered. See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
(6) Two-part Penetration Cable Flashing
May be proprietary or shop-fabricated from galvanized sheet metal, consisting of two parts that are riveted together in the field, secured to the roof assembly and then ‘stripped’ into the field membrane to waterproof the flashing. This type of flashing may be adapted in its design to accommodate a pipe that turns horizontally to the roof field plane. The exit point for the penetration must be shielded with a hood and sloped downward to shed water. Secure separate lid with screw-type fasteners.
See 11.2.3 Curbs and Penetration Flashings for fabrication standards.
(7) Mastic
Applied to area receiving metal penetration flashing. See 11.3.3.1 (12)(1).
(8) Base Membrane Flashing (target patch)
Cut from a single piece of self-adhering or torch-applied base membrane material, it is fashioned with a hole to fit around the penetration flashing and is sealed to the flashing and the roof field. The target patch must cover the flashing flange and extend beyond the edge of the flange, onto the field base membrane, by at least 100 mm (4”). See 11.3.3.1 (12) for all applicable standards.
(9) Cap Membrane (field)
Granule-surfaced membrane. See Tables 9.1 and 9.2 for acceptable cap membrane types and their securement options. See 9.3 for application requirements.
(10) Cap Membrane (flashing)
Granule-surfaced membrane, installed following the standards published in Part 11.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Fibreglass insulation
Cavity fill, to inhibit condensation inside the flashing.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.


Back to RoofStar Guarantee Standards for SBS Modified Bitumen Membrane Systems