Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"
Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"
m (James Klassen moved page EPDM 1.1.3 Fully Adhered System (generic) to EPDM 1.3.1-2 Conventionally Insulated System (adhered)) |
|
(No difference)
|
Revision as of 19:45, 18 February 2020
RoofStar Guarantee Standards are blue-linked |
EPDM Details
1 WORK INCLUDED
- (1) Vapour Retarder
- If required by design authority.
- (2) Insulation
- Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (4) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (5) Membrane Lap
- Thermoset membrane may be joined using uncured tape or proprietary adhesive.
- (6) Edge Flashing
- Proprietary.
- (7) Membrane Flashing
- Installed according to manufacturer's instructions.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Fascia
- Optional.
- (C) Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for EPDM Membrane Systems