Difference between revisions of "ASM Valley (Hooked)"
Difference between revisions of "ASM Valley (Hooked)"
(→WORK INCLUDED) |
|||
Line 20: | Line 20: | ||
;(1) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural Metal Roof Panel''']] | ;(1) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural Metal Roof Panel''']] | ||
;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMVALOVERLAP |'''Valley Panel Overlap''']]: Set in two continuous rows of accepted caulking or sealant tape. | ;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMVALOVERLAP |'''Valley Panel Overlap''']]: Set in two continuous rows of accepted caulking or sealant tape. | ||
− | ;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSLIP|''' | + | ;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSLIP|'''Ventilation Layer''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer. |
;(4) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope. | ;(4) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope. | ||
;(5) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMICE|'''Membrane Strip-in''']]: Accepted self-adhered modified bituminous eave protection membrane. | ;(5) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMICE|'''Membrane Strip-in''']]: Accepted self-adhered modified bituminous eave protection membrane. |
Revision as of 21:26, 17 August 2020
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Architectural Metal Roof Panel
- (2) Valley Panel Overlap
- Set in two continuous rows of accepted caulking or sealant tape.
- (3) Ventilation Layer
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (4) Underlayment
- The type of underlay required is determined by roof slope.
- (5) Membrane Strip-in
- Accepted self-adhered modified bituminous eave protection membrane.
- (6) Continuous Built-In Hook Strip
- (7) Fastening
- Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
- (8) Valley Protection Membrane
- Accepted self-adhered modified bituminous eave protection membrane.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Assemblies