|
|
Line 1: |
Line 1: |
− | <li>An Integrity Scan
| + | |
− | <ol>
| |
− | <li>must be performed by an RGC-recognized service provider {{hilite | listed in this ''Manual'' || 2021-October-30 }}.
| |
− | <li>is required on all ''Waterproofing Systems'', to ensure the waterproofing is leak and damage-free, when ''Overburdens'', amenities or equipment are or will be installed on the completed ''Waterproofing System'' by
| |
− | <ol>
| |
− | <li>anyone other than the ''Contractor''.
| |
− | <li>the ''Contractor'' but only when
| |
− | <ol>
| |
− | <li>{{hilite | the total ''Project'' area (footprint), inclusive of planters or other waterproofed features, exceeds 18.58 m2 (200 sf), and || 2021-October-30 }}
| |
− | <li>the ''Overburdens'', amenities or equipment exceed 150 mm (6”) in depth.
| |
− | </li></ol>
| |
− | <li>is not required when the ''Contractor'' installs overburden, amenities or equipment
| |
− | <ol>
| |
− | <li>equal to or less than 150 mm (6”) in depth.
| |
− | <li>{{hilite | the total ''Project'' area (footprint), inclusive of planters or other waterproofed features, is less than 18.58 m2 (200 sf), but the ''Contractor'' must nevertheless protect all membrane-covered surfaces (including walls and parapets) with RoofStar-accepted protection materials immediately after the membrane is installed || 2021-October-30 }}.
| |
− | </li></ol>
| |
− | </li></ol>
| |
− | <br>
| |
− | See '''Figure 1.1''' for further reference.
| |