Difference between revisions of "Asphalt Shingles - Valley Intersection with Ridge"
Difference between revisions of "Asphalt Shingles - Valley Intersection with Ridge"
(→WORK INCLUDED) |
|||
Line 20: | Line 20: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[Standard for Asphalt Shingle Systems#AShVALLEYMEMBRANE|'''Valley Protection Membrane''']]: Applied beneath the metal valley flashing. |
− | ;(2) [[ | + | ;(2) [[Standard for Asphalt Shingle Systems#AShVALLEYMETAL|'''Valley Metal Flashing''']]: Required for open valleys. |
− | ;(3) [[ | + | ;(3) [[Standard for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements. |
− | ;(4) [[ | + | ;(4) [[Standard for Asphalt Shingle Systems#AShVALLEYTRANSITION|'''Lower Membrane Patch''']]: Required to cover the joint where the ridgeline of one roof joins the sloped plane of another. Cut as illustrated and apply to the slope; the patch must be cut large enough to extend upslope at least 150 mm (6”), but must not exceed the exposure of the ridge cap shingles. |
− | ;(5) [[ | + | ;(5) [[Standard for Asphalt Shingle Systems#AShVALLEYTRANSITION|'''Upper Membrane Patch''']]: Required to overlap the Lower Membrane Patch, ‘shingle-style’, by at least 50 mm (2”). Extend the patch upslope past the Metal Valley Flashing at least 150 mm (6”). |
− | ;(6) [[ | + | ;(6) [[Standard for Asphalt Shingle Systems#AShPART9GEN-APPLICATION|'''Shingles (field)''']]: |
− | ;(7) [[ | + | ;(7) [[Standard for Asphalt Shingle Systems#AShRIDGE|'''Shingle Ridge Cap''']]: |
− | ;(8) [[ | + | ;(8) [[Standard for Asphalt Shingle Systems#AShVALLEYTRANSITION|'''Split Ridge Cap Shingle Transition''']]: Required to tie the ridge caps into the adjacent roof field shingles. |
<hr> | <hr> |
Revision as of 16:48, 8 June 2021
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Valley Protection Membrane
- Applied beneath the metal valley flashing.
- (2) Valley Metal Flashing
- Required for open valleys.
- (3) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (4) Lower Membrane Patch
- Required to cover the joint where the ridgeline of one roof joins the sloped plane of another. Cut as illustrated and apply to the slope; the patch must be cut large enough to extend upslope at least 150 mm (6”), but must not exceed the exposure of the ridge cap shingles.
- (5) Upper Membrane Patch
- Required to overlap the Lower Membrane Patch, ‘shingle-style’, by at least 50 mm (2”). Extend the patch upslope past the Metal Valley Flashing at least 150 mm (6”).
- (6) Shingles (field)
- (7) Shingle Ridge Cap
- (8) Split Ridge Cap Shingle Transition
- Required to tie the ridge caps into the adjacent roof field shingles.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Asphalt Shingle Systems