Difference between revisions of "SBS Tall Parapet"
Difference between revisions of "SBS Tall Parapet"
Line 24: | Line 24: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[SBS Roof Systems Standard#SBSSUBSTRATES|'''Supporting Deck Overlay''']]: If required by design authority. |
− | ;(2) [[ | + | ;(2) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(3) [[ | + | ;(3) [[SBS Roof Systems Standard#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | ;(4) [[ | + | ;(4) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: As required. |
− | ;(5) [[ | + | ;(5) [[SBS Roof Systems Standard#SBSBASE|'''Primary Membrane''']] and [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPROTECTION| '''Membrane Protection''']] |
− | ;(6) [[ | + | ;(6) [[SBS Roof Systems Standard#SBS-STRIPPING|'''Base Membrane Flashing''']]: Mechanically fasten to parapet at termination. |
− | ;(7) [[ | + | ;(7) [[SBS Roof Systems Standard#METALCAP-SBS|'''Base Metal Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''. |
− | ;(8) [[ | + | ;(8) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Counter Flashing''']]: Minimum 25 mm (1") above roof surface. |
− | ;(9) [[ | + | ;(9) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Cap Flashing''']]: Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''. |
<hr> | <hr> | ||
Line 38: | Line 38: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']] |
;(B) '''Air / Vapour Seal''' | ;(B) '''Air / Vapour Seal''' | ||
− | ;(C) [[ | + | ;(C) [[SBS Roof Systems Standard#SBSWALLSUB|'''Acceptable Wall Surface''']] |
;(D) '''Wood Blocking''' | ;(D) '''Wood Blocking''' | ||
− | ;(E) [[ | + | ;(E) [[SBS Roof Systems Standard#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width. |
− | ;(F) [[ | + | ;(F) [[SBS Roof Systems Standard#SBS-STRIPPING|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen. |
;(G) '''Exterior Wall Finish''' | ;(G) '''Exterior Wall Finish''' | ||
− | ;(H) [[ | + | ;(H) [[SBS Roof Systems Standard#METALCAP-SBS|'''Metal Cap Flashing''']]: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise). |
− | ;(I) [[ | + | ;(I) [[SBS Roof Systems Standard#SBSCAPFLASHINGUNDERLAY|'''Cap Flashing Underlay''']]:Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen. |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
Line 56: | Line 56: | ||
<hr> | <hr> | ||
− | [[ | + | [[SBS Roof Systems Standard |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']] |
− | [[SBS | + | [[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']] |
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 14:30, 27 August 2021
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Base Membrane Flashing
- Mechanically fasten to parapet at termination.
- (7) Base Metal Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.
- (8) Metal Counter Flashing
- Minimum 25 mm (1") above roof surface.
- (9) Metal Cap Flashing
- Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Air / Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
- (F) Wall Sheathing Membrane
- Minimum 1 mm (0.040") self-adhered modified bitumen.
- (G) Exterior Wall Finish
- (H) Metal Cap Flashing
- Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
- (I) Cap Flashing Underlay
- Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies