Difference between revisions of "SBS Conventionally Insulated System (typical)"

Jump to: navigation, search

Difference between revisions of "SBS Conventionally Insulated System (typical)"

Line 47: Line 47:
 
<hr>
 
<hr>
  
[[SBS Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
+
[[SBS Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Standard for SBS-modified Bitumen Membrane Roof Systems'']]
  
 
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:37, 30 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details
Click below for a printable version of this page (under development)
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
Optional, depending upon deck condition and roof system requirements (NOTE: the illustrated roof system is adhered. Other securement options are not shown).
(2) Insulation
Installed in staggered and offset layers (not illustrated), and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on Part 3 of the RoofStar Guarantee Standards for the membrane system type.
(3) Insulation Overlay
Subject to the requirements of Part 8 in the RoofStar Guarantee Standards for the membrane system type.
(4) Base Membrane (field)
Mechanically attached, torch-applied, adhered or self-adhered. See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
(5) Base Membrane (flashing)
Carried vertically up a wall or parapet at least 200 mm (8”), and onto the roof field at least 100 mm (4”) (greater if required by the membrane manufacturer). Prime as required (5a).
(6) Cap Membrane (field)
Granule-surfaced membrane. See Tables 9.1 and 9.2 for acceptable membrane types and securement options. See 9.3 for application requirements.
(7) Cap Membrane (flashing)
Extended vertically past the termination of the base membrane flashing, to provide a positive seal at the top edge.
(8) Membrane termination
Vertically applied membranes must be terminated following the options provided for in 10.3.1.2 (9). See also Figure 10.1a et al in Part 10.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck Structure
(B) Wall System

NOTE: See the Standard for additional requirements.


Back to Standard for SBS-modified Bitumen Membrane Roof Systems

Back to SBS Modified Bitumen Construction Details

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.