Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

Jump to: navigation, search

Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

Line 37: Line 37:
 
<hr>
 
<hr>
  
[[EPDM Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Standard for EPDM Membrane Systems]]
+
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
  
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:58, 30 August 2021

RoofStar Guarantee Standards are blue-linked
EPDM Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoset membrane may be joined using uncured tape or proprietary adhesive.
(6) Edge Flashing
Proprietary.
(7) Membrane Flashing
Installed according to manufacturer's instructions.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia
Optional.
(C) Wood Blocking

NOTE: See the Standard for additional requirements.


Back to EPDM Construction Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.