Difference between revisions of "EPDM Air and Vapour Controls (Field)"

Jump to: navigation, search

Difference between revisions of "EPDM Air and Vapour Controls (Field)"

Line 46: Line 46:
 
<hr>
 
<hr>
  
[[EPDM Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Standard for EPDM Membrane Systems]]
+
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
  
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:58, 30 August 2021

Notice to Reader
Images used in a Construction Detail are representative and not intended in their representation of an assembly to be prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the RoofStar Guarantee Standards for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of applicable RoofStar Guarantee Standards may be read by using the blue hyperlinks
EPDM Details
Click below for a printable version of this page (under development)
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
Recommended over steel decks, to provide continuous support for membrane control layers (this fulfills the requirement for continuity, British Columbia Building Code, Div. B, 5.4.1.2 (3)).
(2) Air or Vapour Controls
Self-adhering membrane (typical).
(3) Metal Support
For fully or intermittently unsupported side or end laps. Use pre-finished galvanized steel (min. 24 Ga.), fabricated at least 100 mm (4”) wider than membrane overlaps, and secured with compatible flat-head fasteners (two fasteners per flute, or as otherwise specified).
(4) Long edges
Centre membrane runs along top flutes of steel deck (applicable when no deck overlay is specified and installed).
(5) End laps
Overlap the roll ends at least 100 mm (4”), or as specified by the membrane manufacturer (whichever is greater). End laps must be fully supported by the roof deck or a metal support.
(6) Side laps
Overlap membrane side laps at least 50 mm (2”), or as specified by the membrane manufacturer (whichever is greater). Side laps must be fully supported by the roof deck or a metal support.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to EPDM Construction Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.