Difference between revisions of "TPO Conventionally Insulated System (Typical)"
Difference between revisions of "TPO Conventionally Insulated System (Typical)"
Line 1: | Line 1: | ||
{{Template:RPM Info}} | {{Template:RPM Info}} | ||
− | + | <hr> | |
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | ||
Line 9: | Line 9: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
<div style="text-align:center; vertical-align:center"> | <div style="text-align:center; vertical-align:center"> | ||
− | [[File:6.3.1.1.jpg|class=img-responsive]] | + | [[File:6.3.1.1.jpg| link=http://rpm.rcabc.org/images/d/df/6.3.1.1.jpg | class=img-responsive]] |
</div> | </div> | ||
</div><!-- COL-MD-6 --> | </div><!-- COL-MD-6 --> | ||
Line 15: | Line 15: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;1) [[ | + | ;1) [[TPO Roof Systems Standard#TPOSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. |
− | ;(2) [[ | + | ;(2) [[TPO Roof Systems Standard#TPOINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | ;(3) [[ | + | ;(3) [[TPO Roof Systems Standard#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''. |
− | ;(4) [[ | + | ;(4) [[TPO Roof Systems Standard#TPOADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed. |
− | ;(5) [[ | + | ;(5) [[TPO Roof Systems Standard#TPOSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. |
;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). | ;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). | ||
;(7) '''Membrane Lap''': Thermoplastic membrane may be welded or chemically bonded. | ;(7) '''Membrane Lap''': Thermoplastic membrane may be welded or chemically bonded. | ||
− | ;(8) [[ | + | ;(8) [[TPO Roof Systems Standard#METALCAP-TPO|'''Metal Cap Flashing''']]: As required by the ''RoofStar Guarantee Standards''. |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[TPO Roof Systems Standard#TPODECKS|'''Acceptable Deck''']] |
− | ;(B) [[ | + | ;(B) [[TPO Roof Systems Standard#TPOWALLSUB|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. |
− | ;(C) [[ | + | ;(C) [[TPO Roof Systems Standard#TPOWOODBLOCKING|'''Sloped Wood Blocking''']] |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
− | '''NOTE''': | + | '''NOTE''': See the [[EPDM Roof Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
+ | [[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Construction Details'']] | ||
− | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
− | |||
− | |||
− | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} |
Revision as of 18:26, 30 August 2021
RoofStar Guarantee Standards are blue-linked |
TPO Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (4) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (5) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
- (6) Fasteners
- Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
- (7) Membrane Lap
- Thermoplastic membrane may be welded or chemically bonded.
- (8) Metal Cap Flashing
- As required by the RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Sloped Wood Blocking
NOTE: See the Standard for additional requirements.
Back to TPO Construction Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.