Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"

Jump to: navigation, search

Difference between revisions of "TS Details:E4.7.6 (Tile - Wood Batten Construction)"

Line 4: Line 4:
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
|-
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Tile & Slate Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
+
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Tile Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
|}
  
Line 35: Line 35:
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': See the [[Tile & Slate Systems Standard | '''Standard''']] for additional requirements.
+
'''NOTE''': See the [[Tile Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
[[Tile & Slate System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate System Details'']]
+
[[Tile System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile System Details'']]
  
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 17:52, 31 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
Tile Roofing Details

7.3.3.1.jpg

1 WORK INCLUDED

(1) Underlayment: RoofStar-accepted eave protection / underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.

(2) Wood Battens or Strapping: Treated battens minimum 38 mm x 38 mm (1.5" x 1.5") or lath strapping minimum 12.7 mm x 38 mm (0.5" x 1.5") installed under horizontal battens using non-corrosive fasteners over underlay to provide unobstructed drainage. Install parallel to slope in line with roof structure supports beneath sheathing.

(3) Wood Battens (Purlins): Treated battens 38 mm x 38 mm (1.5" x 1.5") applied over batten or strapping using non-corrosive fasteners. Install perpendicular to slope, spacing determined by manufacturers specification.

(4) Metal Facia: Shop built or manufacturers accepted proprietary eave flashing installed to cover open space between furring battens at facia.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to Tile System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.