Difference between revisions of "TS Details:E4.7.4 (Tile - Roof/Wall Transition)"

Jump to: navigation, search

Difference between revisions of "TS Details:E4.7.4 (Tile - Roof/Wall Transition)"

Line 12: Line 12:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:7.3.2.2.16.jpg|class=img-responsive]]
+
[[File:7.3.2.2.16.jpg| link=http://rpm.rcabc.org/images/8/8d/7.3.2.2.16.jpg | class=img-responsive]]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->

Revision as of 21:50, 31 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
Tile Roofing Details

7.3.2.2.16.jpg

1 WORK INCLUDED

(1) Linear metal flashings
Linear metal flashings bridge the gap between field areas and any protrusions such as pipes, vents, and adjoining walls. Because these items impede the flow of water, small deficiencies can cause high amounts of water to enter the building. Proper detail work will make the difference between a successful or problematic roof.Flashing for a wall termination should lap the tile by a minimum of 100 mm (4"). Material should be the 26-Ga. pre-painted galvanized with S locks or standing seams to join lengths.
(2) Mortar or mastic
A mortar or mastic bedding should be applied to the tops of the concrete tile before flashing to prevent wind blown rain or vermin from entering.

NOTE: See the Standard for additional requirements.


Back to Tile System Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.