=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[SBS Roof Systems Standard#AIRVAPOUR|'''Air/Vapour barrier''']]: Self-adhered membrane, as specified in design.  Install following manufacturer’s requirements.
+
;(1) [[SBS Roof Systems Standard#PART_6|'''Air/Vapour barrier''']]: Self-adhered membrane, as specified in design.  Install following manufacturer’s requirements.
;(2) [[SBS Roof Systems Standard#GENERAL|'''Roof system''']]: Conventionally insulated system shown (refer to the membrane Standard for requirements).
+
;(2) [[SBS Roof Systems Standard#PART_1|'''Roof system''']]: Conventionally insulated system shown (refer to the membrane Standard for requirements).
;(3) [[SBS Roof Systems Standard#MEMBRANES|'''Field Membrane''']]: SBS-modified bituminous system shown (see Part 9 for standards)
+
;(3) [[SBS Roof Systems Standard#PART_9|'''Field Membrane''']]: SBS-modified bituminous system shown (see Part 9 for standards)
;(4) [[SBS Roof Systems Standard#PERIMETERS|'''Self-adhered membrane (pre-flashing)''']]: Apply over rough sill or sill woodwork.  Prime as required.
+
;(4) [[SBS Roof Systems Standard#PART_10|'''Self-adhered membrane (pre-flashing)''']]: Apply over rough sill or sill woodwork.  Prime as required.
;(5) [[SBS Roof Systems Standard#DOOR|'''Metal water-stop flashing''']]: Dimensions as specified in design.  Mechanically attach to inside face of door sill.  Cut flashing to fit opening width.
+
;(5) [[SBS Roof Systems Standard#PART_10|'''Metal water-stop flashing''']]: Dimensions as specified in design.  Mechanically attach to inside face of door sill.  Cut flashing to fit opening width.
;(6) [[SBS Roof Systems Standard#PERIMETERS|'''Membrane flashing''']]: Base membrane shown.  Install to overlap and seal in metal water-stop flashing.
+
;(6) [[SBS Roof Systems Standard#PART_10|'''Membrane flashing''']]: Base membrane shown.  Install to overlap and seal in metal water-stop flashing.
;(7) [[SBS Roof Systems Standard#DOOR|'''Membrane gussets''']]: Install in corners to seal joints.
+
;(7) [[SBS Roof Systems Standard#PART_10|'''Membrane gussets''']]: Install in corners to seal joints.
;(8) [[SBS Roof Systems Standard#CAPCOUNTERBASE|'''Metal base flashing (under door)''']]: Optional; protection for membrane when pavers are installed (shown), or when exposed membrane is vulnerable to damage.  Mechanical fasteners must be at least 87.5 mm (3-1/2”) above the drainage plane.
+
;(8) [[SBS Roof Systems Standard#PART_13|'''Metal base flashing (under door)''']]: Optional; protection for membrane when pavers are installed (shown), or when exposed membrane is vulnerable to damage.  Mechanical fasteners must be at least 87.5 mm (3-1/2”) above the drainage plane.
;(9) [[SBS Roof Systems Standard#PERIMETERS|'''Membrane flashing''']]: Applicable for exterior-insulated walls.  Seals roof membrane flashing to air/vapour barrier on wall and provides sufficient exposure for positive union with WRB (by others).  Mechanically secure membrane (metal base flashing used for securement in this detail).
+
;(9) [[SBS Roof Systems Standard#PART_10|'''Membrane flashing''']]: Applicable for exterior-insulated walls.  Seals roof membrane flashing to air/vapour barrier on wall and provides sufficient exposure for positive union with WRB (by others).  Mechanically secure membrane (metal base flashing used for securement in this detail).
;(10) [[SBS Roof Systems Standard#CAPCOUNTERBASE|'''Metal base flashing (walls)''']]: Optional; protects membrane flashing from damage, and functions as removable panel to permit access to membrane flashing for future replacement.
+
;(10) [[SBS Roof Systems Standard#PART_10|'''Metal base flashing (walls)''']]: Optional; protects membrane flashing from damage, and functions as removable panel to permit access to membrane flashing for future replacement.
 
;(11) [[SBS Roof Systems Standard#PLATFORM|'''Pavers and pedestals''']]: May be installed by others, if specified.  See '''Part 14''' for material and application requirements.  Must be at least 12 mm (1/2”) away from other pavers, and from membrane flashing or metal base flashing, to permit adequate drainage.
 
;(11) [[SBS Roof Systems Standard#PLATFORM|'''Pavers and pedestals''']]: May be installed by others, if specified.  See '''Part 14''' for material and application requirements.  Must be at least 12 mm (1/2”) away from other pavers, and from membrane flashing or metal base flashing, to permit adequate drainage.
  

Revision as of 18:36, 1 September 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

1 WORK INCLUDED

(1) Air/Vapour barrier
Self-adhered membrane, as specified in design. Install following manufacturer’s requirements.
(2) Roof system
Conventionally insulated system shown (refer to the membrane Standard for requirements).
(3) Field Membrane
SBS-modified bituminous system shown (see Part 9 for standards)
(4) Self-adhered membrane (pre-flashing)
Apply over rough sill or sill woodwork. Prime as required.
(5) Metal water-stop flashing
Dimensions as specified in design. Mechanically attach to inside face of door sill. Cut flashing to fit opening width.
(6) Membrane flashing
Base membrane shown. Install to overlap and seal in metal water-stop flashing.
(7) Membrane gussets
Install in corners to seal joints.
(8) Metal base flashing (under door)
Optional; protection for membrane when pavers are installed (shown), or when exposed membrane is vulnerable to damage. Mechanical fasteners must be at least 87.5 mm (3-1/2”) above the drainage plane.
(9) Membrane flashing
Applicable for exterior-insulated walls. Seals roof membrane flashing to air/vapour barrier on wall and provides sufficient exposure for positive union with WRB (by others). Mechanically secure membrane (metal base flashing used for securement in this detail).
(10) Metal base flashing (walls)
Optional; protects membrane flashing from damage, and functions as removable panel to permit access to membrane flashing for future replacement.
(11) Pavers and pedestals
May be installed by others, if specified. See Part 14 for material and application requirements. Must be at least 12 mm (1/2”) away from other pavers, and from membrane flashing or metal base flashing, to permit adequate drainage.

2 RELATED WORK BY OTHERS

(A) Wall and cladding
Generic and representative only.
(B) WRB (Water Resistant Barrier)
Generic and representative only.
(C) Door and jamb assembly
Generic and representative only.

NOTE: See the Standard for additional requirements.