=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[SBS Roof Systems Standard# | + | ;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: If required by design authority. |
− | ;(2) [[SBS Roof Systems Standard# | + | ;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layers''']]: If required by design authority. |
− | ;(3) [[SBS Roof Systems Standard# | + | ;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | ;(4) [[SBS Roof Systems Standard# | + | ;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Where required. |
− | ;(5) [[SBS Roof Systems Standard# | + | ;(5) [[SBS Roof Systems Standard#PART_9|'''Primary Membrane''']] and [[SBS Roof Systems Standard#PART_9| '''Membrane Protection''']] |
− | ;(6) [[SBS Roof Systems Standard# | + | ;(6) [[SBS Roof Systems Standard#PART_10|'''Membrane Flashing''']] |
− | ;(7) [[SBS Roof Systems Standard# | + | ;(7) [[SBS Roof Systems Standard#PART_13|'''Membrane Counter Flashing''']] |
− | ;(8) [[SBS Roof Systems Standard# | + | ;(8) [[SBS Roof Systems Standard#PART_10|'''Base Metal Flashing''']]: Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. |
;(9) <b>Metal Flashing / Cladding</b> | ;(9) <b>Metal Flashing / Cladding</b> | ||
;(10) '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset in detail [[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|'''D1.7.19 Roof-Wall Transitions (Fire Separation Wall)''']]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall. | ;(10) '''Secondary Metal Cap Flashing''': Joints to be offset from Cap Flashing, <b>OR</b> Water Channeling Clip may be used (See inset in detail [[SBS Details:D1.7.19 Roof-Wall Transitions (Fire Separation Wall)|'''D1.7.19 Roof-Wall Transitions (Fire Separation Wall)''']]), <b>OR</b> solder standing seam joints. Do <b><u>NOT</u></b> place combustible materials over top of firewall. | ||
− | ;(11) [[SBS Roof Systems Standard# | + | ;(11) [[SBS Roof Systems Standard#PART_13|'''Metal Cap Flashing''']]: Standing seam joints required. |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[SBS Roof Systems Standard# | + | ;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']] |
− | ;(B) [[SBS Roof Systems Standard# | + | ;(B) [[SBS Roof Systems Standard#PART_2|'''Acceptable Wall Surface''']] |
;(C) '''Wood Blocking''' | ;(C) '''Wood Blocking''' | ||
;(D) '''Grouted Finish''': Sloped surface to promote drainage off cap flashing. | ;(D) '''Grouted Finish''': Sloped surface to promote drainage off cap flashing. |
Revision as of 18:40, 1 September 2021
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks |
SBS Details
1 WORK INCLUDED
- (1) Supporting Deck Overlay
- If required by design authority.
- (2) Air or Vapour Control Layers
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay
- Where required.
- (5) Primary Membrane and Membrane Protection
- (6) Membrane Flashing
- (7) Membrane Counter Flashing
- (8) Base Metal Flashing
- Mechanically fasten to top of plywood backing. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
- (9) Metal Flashing / Cladding
- (10) Secondary Metal Cap Flashing
- Joints to be offset from Cap Flashing, OR Water Channeling Clip may be used (See inset in detail D1.7.19 Roof-Wall Transitions (Fire Separation Wall)), OR solder standing seam joints. Do NOT place combustible materials over top of firewall.
- (11) Metal Cap Flashing
- Standing seam joints required.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Acceptable Wall Surface
- (C) Wood Blocking
- (D) Grouted Finish
- Sloped surface to promote drainage off cap flashing.
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details