Difference between revisions of "PVC Conventionally Insulated System (Alternate)"

Jump to: navigation, search

Difference between revisions of "PVC Conventionally Insulated System (Alternate)"

 
Line 6: Line 6:
 
<big><big>Division D - Construction Details</big></big>
 
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
<big><big><big><big><big>PVC 1.3.1-2 Conventionally Insulated System (adhered)</big></big></big></big></big>
+
<big><big><big><big><big>PVC | Conventionally Insulated System (Alternate) ([[PVC_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])</big></big></big></big></big>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:Construction Details Header}}
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[PVC Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''PVC Details'''</big></div>
 
<div class="panel-heading"><big>'''PVC Details'''</big></div>
Line 23: Line 19:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCVAPOUR|'''Vapour Retarder''']]: If required by design authority.
+
;(1) [[PVC Roof Systems Standard#PART_6|'''Vapour Retarder''']]: If required by design authority.
;(2) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCINSULATION|'''Insulation''']]: Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(2) [[PVC Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
;(3) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
+
;(3) [[PVC Roof Systems Standard#PART_9|'''Adhesive''']]: Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
;(4) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer’s instructions and ''RoofStar Guarantee Standards''.
+
;(4) [[PVC Roof Systems Standard#PART_9|'''Single-ply Membrane''']]: Installed according to manufacturer’s instructions and ''RoofStar Guarantee Standards''.
;(5) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCLAP|'''Membrane Lap''']]: Thermoplastic membrane may be welded or chemically bonded.
+
;(5) [[PVC Roof Systems Standard#PART_9|'''Membrane Lap''']]: Thermoplastic membrane may be welded or chemically bonded.
;(6) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCEDGE|'''Edge Flashing''']]: Proprietary, coated with membrane material and heat-welded to the primary (field) membrane.
+
;(6) [[PVC Roof Systems Standard#PART_10|'''Edge Flashing''']]: Proprietary, coated with membrane material and heat-welded to the primary (field) membrane.
 
;(7) '''Fascia Flashing Clip''': Affixed to the fascia material (installed by others) with fasteners O.C. 300 mm (12”).
 
;(7) '''Fascia Flashing Clip''': Affixed to the fascia material (installed by others) with fasteners O.C. 300 mm (12”).
;(8) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCFASCIA|'''Fascia Flashing''']]: Manufactured to RoofStar Guarantee Standards for sheet metal flashings.
+
;(8) [[PVC Roof Systems Standard#PART_13|'''Fascia Flashing''']]: Manufactured to RoofStar Guarantee Standards for sheet metal flashings.
;(9) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer’s printed specifications using proprietary adhesive.  Must be carried to the outside of the parapet or vertically to a minimum of 200 mm (8”) above the finished roof surface.  Welded or adhered to primary membrane depending on membrane type.
+
;(9) [[PVC Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Adhered according to manufacturer’s printed specifications using proprietary adhesive.  Must be carried to the outside of the parapet or vertically to a minimum of 200 mm (8”) above the finished roof surface.  Welded or adhered to primary membrane depending on membrane type.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCDECKS|'''Acceptable Deck''']]
+
;(A) [[PVC Roof Systems Standard#PART_2|'''Acceptable Deck''']]
;(B) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCWALLSUB|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
+
;(B) [[PVC Roof Systems Standard#PART_10|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
;(C) [[RoofStar Guarantee Standards for PVC Membrane Systems#PVCWOODBLOCKING|'''Edge Blocking''']]
+
;(C) [[PVC Roof Systems Standard#PART_13|'''Edge Blocking''']]
 
;(D) '''Fascia Material'''
 
;(D) '''Fascia Material'''
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->

Latest revision as of 22:16, 27 June 2022



Division D - Construction Details


PVC | Conventionally Insulated System (Alternate) ( Article 1.1.3.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

PVC Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
(4) Single-ply Membrane
Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoplastic membrane may be welded or chemically bonded.
(6) Edge Flashing
Proprietary, coated with membrane material and heat-welded to the primary (field) membrane.
(7) Fascia Flashing Clip
Affixed to the fascia material (installed by others) with fasteners O.C. 300 mm (12”).
(8) Fascia Flashing
Manufactured to RoofStar Guarantee Standards for sheet metal flashings.
(9) Membrane Flashing
Adhered according to manufacturer’s printed specifications using proprietary adhesive. Must be carried to the outside of the parapet or vertically to a minimum of 200 mm (8”) above the finished roof surface. Welded or adhered to primary membrane depending on membrane type.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Parapet Surface
Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
(C) Edge Blocking
(D) Fascia Material

NOTE: See the Standard for additional requirements.


Back to PVC Construction Details

Home

© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.