Difference between revisions of "LMF Metal Cap Flashing (joints)"
Difference between revisions of "LMF Metal Cap Flashing (joints)"
m (James Klassen moved page LMF 13.3.1-1 Metal Cap Flashing (joints) to LMF Metal Cap Flashing (joints)) |
|||
Line 6: | Line 6: | ||
<big><big>Division D - Construction Details</big></big> | <big><big>Division D - Construction Details</big></big> | ||
<hr> | <hr> | ||
− | <big><big><big><big><big>LMF | + | <big><big><big><big><big>LMF | Metal Cap Flashing (joints)</big></big></big></big></big> |
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''Notice to Reader'''''</big> | | colspan="2" | <big>'''''Notice to Reader'''''</big> |
Revision as of 19:06, 22 November 2022
Division D - Construction Details
LMF | Metal Cap Flashing (joints)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements can be read in any Standard and may be read by using the blue hyperlinks |
SBS Details
- Click below for a printable version of this page (under development)
1 WORK INCLUDED
- (1) Metal Cap Flashing
- Fabricate and install in keeping with the requirements in Part 13, "Linear Metal Flashings". Base membrane must extend across the top of the parapet (to waterproof the structure and separate the metal from moisture-susceptible substrates) and extend down the outside face of the parapet at least 50 mm (2”). Edges must be hemmed (1a), although a kicked-out drip edge is optional.
- (2) Fasteners
- Select for compatibility with metal flashing, membrane and substrate (Article 13.2.1.3., "Fasteners").
- (3) Clips
- Install cap flashings using a continuous or discontinuous metal ‘wind’ clip affixed to the outside face of the parapet, or to the top of the parapet (see Alternate illustration). Refer to Part 13 in the related Standard for securement requirements.
- (4) Seam
- Must be either a Standing Seam (illustrated on top face) or an S-lock (illustrated for the vertical faces; also see inset illustrations). The use of acceptable seams allows for multi-directional expansion and contraction of sheet metal.
- (5) Standing Seam Clip
- Fastened into substrate.
2 RELATED WORK BY OTHERS
- (A) Parapet Structure
- (B) Parapet woodwork (sloped toward roof surface
NOTE: See the related Standard for additional requirements.
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.