Difference between revisions of "EPDM Roof System Details"
Difference between revisions of "EPDM Roof System Details"
(→Part 10 - Perimeters and Walls) |
|||
Line 43: | Line 43: | ||
===Part 10 - Perimeters and Walls=== | ===Part 10 - Perimeters and Walls=== | ||
+ | ====='''General Application''' ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])===== | ||
+ | <ol> | ||
+ | <li>[[EPDM Membrane Termination A | Membrane Termination A]] | ||
+ | <li>[[EPDM Membrane Termination B | Membrane Termination B]] | ||
+ | <li>[[EPDM Membrane Termination C | Membrane Termination C]] | ||
+ | <li>[[EPDM Membrane Termination D | Membrane Termination D]] | ||
+ | <li>[[EPDM Membrane Termination E | Membrane Termination E]] | ||
+ | <li>[[EPDM Membrane Termination F | Membrane Termination F]] | ||
+ | </li></ol> | ||
===Part 11 - Drainage=== | ===Part 11 - Drainage=== |
Latest revision as of 16:30, 26 February 2024
- Division D - Construction Details
- Construction Details for EPDM Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about EPDM Membrane System designs and requirements, see the Standard for EPDM Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Conventionally Insulated System (Typical)
- Conventionally Insulated System (Alternate)
- Protected Roof Assembly (Typical)
Part 6 - Air and Vapour Controls
Continuity and Support ( Article 6.3.2.1.)
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A
- Membrane Termination B
- Membrane Termination C
- Membrane Termination D
- Membrane Termination E
- Membrane Termination F
Part 11 - Drainage
Part 12 - Penetrations and Curbs
Part 13 - Linear Metal Flashing
- See the separate page, Construction Details for Linear Metal Flashings.
Part 14 - The Roof as a Platform
Standard for EPDM Membrane Roof Systems
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.