|
|
Line 24: |
Line 24: |
| ;Acceptance Criteria: Refer to the [[VRA Standard | RGC Standard for Vegetated Roofs]] | | ;Acceptance Criteria: Refer to the [[VRA Standard | RGC Standard for Vegetated Roofs]] |
| <div style="text-align: left;"> | | <div style="text-align: left;"> |
− | [[File:Extensive VR System (sedum tile).jpg|class=img-responsive| link=http://rpm.rcabc.org/images/2/29/SBS_1.3.1-1.jpg]] | + | [[File:Extensive VR System (sedum tile).jpg|class=img-responsive| link=https://rpm.rcabc.org/images/d/d7/Extensive_VR_System_%28sedum_tile%29.jpg]] |
| </div> | | </div> |
| </div> | | </div> |
Revision as of 18:33, 11 October 2024
Division C - Accepted Materials
Group - Vegetated Roof Systems
SOPRANATURE® Extensive-Inverted Vegetated Roof
by Soprema Inc.
Material Acceptance and Product Details
The information published in the RCABC Roofing Practices Manual and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the Guarantor. The preparation of a detailed specification is the responsibility of the Design Authority.
|
- Vegetated Roof System Manufacturer
- Name linked to website here
- Accepted for the RoofStar Guarantee Program
- October 25, 20204
- Accepted for application in
- Vegetated Roof Systems
- Acceptance Criteria
- Refer to the RGC Standard for Vegetated Roofs
- System Summary
- description here, using
breaks
- System Depth
- give range
- Growing Media Depth
- give range
- Vegetation Profile
- give manufacturer's profile name or description
- Suitable climate zones
- give range or list zone numbers
- System Components
- Component name (Click [link here] for the Technical Data Sheet PDF)
- Component name (Click [link here] for the Technical Data Sheet PDF)
- Component name (Click [link here] for the Technical Data Sheet PDF)
- Component name (Click [link here] for the Technical Data Sheet PDF)
- Component name (Click [link here] for the Technical Data Sheet PDF)
- Conditions and Limitations
- description here, using
breaks
|
Back to Accepted Materials
Home