(→RELATED WORK BY OTHERS) |
|||
Line 26: | Line 26: | ||
(C) <b>Wood Blocking:</b> Equal to height of insulation. | (C) <b>Wood Blocking:</b> Equal to height of insulation. | ||
− | NOTE: Refer to <i>RGC Guarantee Standards</i> for additional requirements. | + | |
+ | '''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements. | ||
+ | |||
+ | |||
<hr> | <hr> | ||
+ | |||
Revision as of 17:50, 19 July 2016
1 WORK INCLUDED
(1) Vapour Retardant: If required by design authority.
(2) Insulation: Mechanically attached where deck type permits. Installed according to RGC Guarantee Standard A4.3. See Section 2.2 for accepted materials
(3) Adhesive: Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed.
(4) Single Ply Membrane: Installed according to manufacturer’s instructions and RGC Guarantee Standards Section 2.1.1 and Section 2.1.3.
(5) Membrane Lap: Thermoplastic membrane may be welded or chemically bonded (See Section 6.2) Thermoset membrane may be joined using uncured tape or proprietary adhesive (See Section 6.1).
(6) Edge Flashing: Proprietary.
(7) Membrane Flashing: Installed according to manufacturer’s instructions.
2 RELATED WORK BY OTHERS
(A) Acceptable Deck
(B) Fascia: Optional.
(C) Wood Blocking: Equal to height of insulation.
NOTE: Refer to RGC Guarantee Standards for additional requirements.